Agency,Federal 1
CONTENTS 1
A 1
Activity 1
Agent 1
Agency,Assigned 1
Advanced Development 2
Activity,Lead Service 2
Airframe Structure 2
Assignee 2
Activity,Participating 3
Applicant 3
Acceptance Trials 3
Activity,Review 3
Aerospace Vehicle 4
Activity,Preparing 4
Activity,Military Coordinating 4
Aerospace Vehicle Equipment 4
Availability 5
Activity,User 5
Activity,Assignee 5
Application 5
Appendixes 6
Assembly 6
Accessary 6
Attachment 6
Acquisition 7
Aerospace Ground Equipment 7
Acceptance Tests 8
Acceptance Test Environments 8
Acceptable Quality Level 9
Aggravated test 9
Aging,Undistorted,Accelerated 9
Achieved Availability 10
Accessibility 10
Acquisition Management System Control Number 10
Acceptance Number 10
Aging,Artificial 11
Acquisition Management Systems and Data 11
Requirement Control Iist 11
Administractive Data 11
Averange Outgoing Quality 12
Adaptive Contol System 12
Ambinet Vibration 12
Artificial Environment 12
Average Outgoing Quality Limit 12
Airfield,Heavy-Load 13
Average Sample Size Curve 13
Attribute 13
Administrative and Logistic Delay Time 13
Apportioned Unit Cost 13
Airfield,Forward-Aera(Base) 14
Airfield,Light-Load 14
Airfield,Rear_Area(Base) 15
Airfield,Zone of Interior(Base) 15
Applied Meteorology 15
Airfield,Theater_of_Operations(Base) 16
Applied Shock 16
Airfield,Support_Area(Base) 17
Airfield,Expeditionary(Base) 17
Applied Climatology 18
Airfield,Medium Load(Base) 18
Aero,Light VTOL Landing 18
Atmospheric 19
Applied Environmental Research 19
Atmospheric Optics 19
Atmospheric phenomenon 20
Black Recording 21
B 21
Backup 21
Background 21
Background Count 21
Baseline 22
Bias 22
Burst 22
Burn-in 23
Burst Pressure 23
Brake Control System 23
Contract 24
Bomb Gear 24
Bump Tester 24
C 24
Configuration Control 25
Configuration 25
Configuration Itemn 25
Contract Data Requiremants List 26
Configuration Management 26
Configuration Identification 26
Critical Item 26
Calibration 26
Configuration Status Accounting 27
Checkout 27
Criticality Analysis 27
Contractor 27
Classified Information 28
Certificate of Conformance 28
Commercial Products 28
Custodian 28
Categories of Contractors 29
Commercial Data 29
Common Group Items 30
Coordinated Procurement 30
Contract Quality Requirements 30
Compatative Tests 30
Crash Safety 31
Classification of Defects 31
Commonality 31
Corrosion,Destructive 32
Critical Defective 32
Corrosion,Electro-chemical 32
Corrosion,Fretting 32
Corrosion,Test 33
Corrosion,Underfilm 33
Corrosion,Crevice 33
Corrosion,Galvanic 33
Corrosion,Fatigue Limit 33
Cooling,Regenerative 34
Cold Dry 34
Cold Wet 34
Component(1) 35
Cooling,Film 35
Cold Soak 35
Cycling 35
Cycling Logarithmic 35
Coordination 36
Component(2) 36
Comment,Essential 36
Comment,Suggested 37
Cycling,Linear 37
Cycle 37
Critical Design Review 37
Corrosion,Intergranular 38
Class 38
Common Purchasing Agreement 38
Cycling,Log-Log 38
Central Air Data Computer 39
Corrosion,Stress 39
Corrosion,Coefficient of 39
Corrosion,Preventien 39
Chamber,Altitude 40
Chamber,Humidity 40
Chamber High Temperature 40
Chamber,Accelerate Weathering 41
Chamber,Salt Spray 41
Chamber,Clean 41
Chamber,Reverberant 41
Compatibility 42
Chamber,Salar Radiation 42
Chamber,Temperature 42
Circuit Reliability 42
Compatibility,Intra-system Electromagnetic 43
Communications Survivability 44
Computer,True Airspeed 44
Composite 44
Computer,Rotation Go-Round 45
Compliance 45
Computer,Altitude 45
Computer,Flight Director 45
Command and Control System Equipment 45
Critical Energy 46
Computer,Letdown,Vertical/Navigation 46
Computer,Logic and Monitor 46
Coupling Agent 46
Criticality 46
Clearance Number 47
Critical Defect 47
Critical Temperature 47
Creep 47
CIP_Cast_In_Place 48
Crack Propagation Resistance 48
Climatization 48
Climatic Test 48
Casualty Criteria 49
Chemical Tempering 49
Contact Molding 49
Cloud_Chamber Effect 49
Development Monitor 50
Chemical Agent,Phosgene 50
D 50
Department,Participating 50
DoD AMSDL Clearance Office 50
Development 51
Distributor 51
Dimensional Stability 51
Dependability 51
Development Specification 52
Development Test and Evaluation 52
Damage mode 52
De_Bugging 52
Demonstration 52
Design Allowables 52
Data Item Description 53
Detail Specification 53
DoD Component 53
Data Source 54
Direct Maintenance Man Hours per Maintenance Action 54
Data Product 54
Data Transfer Rate 54
Damage Tolerance 55
Duration,Shutdown 55
Data Terminal Equipment 55
Data Subscriber Terminal Equipment 55
Durability 56
Drop Test 56
Development Test 56
Downing Event 56
Deviation 57
Detection-correction System 57
Drop Test 57
Depot Maintenance 58
Defective 58
Dynamic Load 58
Deficiencies 59
Defects-Per-Hundred-Units 59
Deterioration 59
Deterioration Resistance 60
Depot/Shipyards 60
Damage Effects 60
Defect 60
Degradation 60
Environmental Research 61
Deterioration-Resistance Products 61
E 61
Environmental Engineering 61
Environmental Factor 62
Environmental Field Test 62
Environmental Control 62
Environmental Design Criteria 62
Environmental Lapse Rate 63
Environmental Test 63
Environmental operational 63
Environmental operating Conditions 63
Electromagnetic Compatibility 64
Electromagnetic Environment 64
Environmental Resistance Feature 64
Evironmental Suitability of a Product 64
Engineering Management 65
Engineering Development 65
Engineering Development(Service Test) 65
Engineering Change Proposal 65
Examination 66
Engineering Practices 66
Failure Mode 67
End Item 67
EX Number 67
F 67
First Article Inspection 67
Failure Cause 68
Failure 68
Faiure,Dependent 69
Failure Analysis 69
Failure Mode and Effects Analysis(FMEA) 69
Failure,Critical 69
Faiure Random 69
Failure,Catastrophic 69
Failure Rate 70
Failure,Independent 70
Failure,Intermittent 70
Failure,Non-Chargeable 70
Failure,Non-Relevent 70
Fail-Safe Device 71
Failure Effect 71
Failure Mechanism 71
Fault 71
Fault Isolation 71
Fail-Safe Operation 71
Fail-Safe Design 71
Facility Equipment 72
Eacilities Design Criteria 72
Facilities 72
Flight Essential Functions 73
Flight Test 73
Fligit Test Vehicle 73
Flight Regime 73
Fragility Factor 74
Flexible Item 74
Fragile 74
Feedback Control System 75
Fastening System 75
Forcing Function 75
Feedback 75
Free Rocket 76
Feedback Control Loop 76
Functional Configuration Identification 76
Inspection 77
Formal Qualification Review 77
Functional Configuration Audit 77
I 77
Inspection by Variables 78
Inspection,Original 78
Inspection Level 78
Inspection by Attributes 78
Inspection,Quality Conformance 78
Interchangeable Item 79
Inspection,In-process 79
Inspection,Tightened 79
Inspection,Cyclical 79
Inspection Record 79
Item 79
Item Standardization Codes 80
Item of Supply 80
Item Reduction Study 80
Industry Group 80
Interfaces 81
Initial Quality 81
Indenture Level 82
Interference 82
Intermediate Maintenance 82
Inside Plant 83
Initial Indenture Level 83
Interoperability 83
Induced Environment 84
Intelligibility 84
Industrial Packaging 84
Intermediate Pack 84
Item,Standard 85
Information Transfer 85
Interface Desigh Specification 85
Inherent R M Value 85
Kill Probability 86
J 86
Jan Brand 86
K 86
Lot(Materials) 87
L 87
Lot 87
Lot(Electronic Part) 87
Life Profile 88
Lot Size 88
Lot Formation 88
Life Units 88
Life Cycle History 88
Limiting Quality 89
Long Lead Time Items 89
Line Replaceable Unit 89
Live Room 89
Limited Application part 89
Laminate 90
Limited Coordination Military Specification 90
Lead Service 90
Long Life Container 90
Maintenance,Preventive 91
Lattice Imperfection 91
M 91
Maintenance,Corrective 92
Maintenance Event 92
Maintainability,Mission 92
Mission Profile 92
Maintenance,Scheduled 93
Maintainability 93
Maintenance Action 93
Maintenance Time 93
Major Defect 94
Mean-Time-To-Service(MTTS) 94
Mean-Time-To-Restore System(MTTRS) 94
Mean-Time-Between-Maintenance(MTBM) 94
Minor Defect 94
Mean Active Maintenance Downtime(MAMDT) 95
Minor Defective 95
Major Defective 95
Mean Time Between Maintenance Inherent(MTBM Inherent) 95
Mean Time Between Maintenance Induced(MTBM Induced) 95
Mean Time Between Preventive Maintenance(MTBPM) 96
Mean Time Between Maintenance No Defect(MTBM NO Defect) 96
Mean-Time-To-Failure(MTTF) 97
Material Review Board 97
Maintenance,Manning Level 97
Mean-Time-Between-Removals(MTBR) 97
Mission-Time-To-Restore-Functions(MTTRF) 98
Mean-Time-Between-Failure 98
Mean-Time-Between-Demands(MTBD) 98
Mean-Time-To-Repair(MTTR) 98
Maintainability Design 99
Mean-Time-Between-Maintenance Actions(MTBMA) 99
Mean-Time-Between-Downing-Events(MTBDE) 99
Mission-Time-Between-Critical-Failure(MTBCF) 99
Maintenance Quality Assurance 100
Maintenance Concept 100
Maintenance Coneept Impact 100
Maintainability Model 100
Mission Profile 101
Manufacturing Baseline 101
Military Speci fication 101
Military Bulletin 102
Maintenance Task 102
Maintenance Ground Equipment 102
Maintenance Task Distribution 102
Mode of Vibration,Normal 103
Military Parts Control Advisory Group 103
Measuring and Test Equipment 104
Modes,Coupled,Modes of Vibration 104
Mode,Resonant 104
Mode of Vibration 104
Mean Daily Maximum Temperature 104
Mean Hourly Temperature 104
Microcircuit Module 105
Management Data 105
Marginal Testing 105
Module 105
Monomeric Cement 106
Mark and MOD Nomenclature 106
Modification Number 106
Mark Number 106
Monomer 106
Multiapplication Containers 107
Masking 107
Noise Randoom 108
N 108
Normal Inspection 108
Nonconformance 108
Noncritical Items 108
Noise Critical,Alternate 109
Noise Background 109
Noise,White 109
Noise-concelling 109
National Coordinating Activity 110
National Qualification 110
Operational Availability(AO) 111
O 111
Operating Cha racteristic Curves 111
One Hundred percent Inspection 111
Objective QualityEvidence 111
Off Equipment Maintenance 112
Organizational Maintenance 112
Operating Life 112
Overhaul Cycle 112
Operating Ground Equipment 113
Operational R M Value 113
Operational Readiness 113
Oporational Test and Evaluation 113
Overshoot 114
Operational Environment 114
Off-The-Shelf Item 114
Operational Support 114
Pre-Award Survey 115
Overshoot Factor 115
Other Indenture Level 115
Office of Primary Responsibility(OPR) 115
P 115
Prevent Failure 116
Probability of Acceptance 116
Process average 116
Product Quality Review 116
Produt Defective 116
Preventive Maintenance 116
Primary Damage Mechanism 117
Percentage of Failure Rate 117
Proof Test 117
Pot Life 117
Periodic Inspection 117
Production Lead Time 117
Producer 118
Primary Damage Effects 118
Product 118
Preparing Activity(PA) 119
Procuring Activity 119
Procuring Agent/Agency 119
Program Plan 120
Proposed PPSL 120
Program 120
Program Analysis 120
Producibilitv 121
Personnel Subsystem 121
Parts Control Board(PCB) 121
Privately Developed Item 121
Production Feasibility 121
Preliminary Design Review 122
Production Engineering 122
Product Specification 123
Physical Configuration Audit(PCA) 123
Patch(Low Level Language) 123
Part 123
Program,Stop 123
Preproduction(Prototype) 124
Program Manager 124
Pragram Design Specification 124
Program Performance Specification 124
Platform Environment 125
Production 125
Production Readiness Review(PRR) 125
Prototype Pack 125
Plasticizer 126
Program Parts Selection List(PPSL) 126
Pressure,Recovered 126
Pressure Tendency 126
Quality Conformance Inspection 127
Q 127
Quality 127
Quality Assurance(QA) 127
Quality Control(QC) 127
Qualification 127
Quality Program Requirement 128
Quality Assurance Representative(QAR) 128
Qualified Product 128
Qualified Product List 128
Quantitative Testing 129
Qualification Test 129
Reliability Assurance 130
R 130
Reliability 130
Replaceable Unit 130
Replaceable Module 130
Reduced Capability Mode 131
Repair Survival Rate(RSR) 131
Retrofit 131
Random Sample 131
Reduced Inspection 131
Reiection Number 131
Redudance,Standby 132
Remote-Handling System 132
Reusable Container 132
Returnable Empty 132
Redundancy 132
Redundant 132
Specification 133
Response,Spurious 133
Response,Standard 133
Reproducibility 133
S 133
Standardization 133
Standardization Directory(SD_1) 134
Standard 134
Standardization Documents 134
Standardization Project 134
Selective Application and Tailoring 135
Standardization Accomplishment Report 135
System Spccification 135
Supplier Surveillance 136
Stratification Code 136
Statement of Intent 136
Supplier 136
Sampling Frequency(f) 137
Subcontractor 137
Style 137
Sample 137
Sample Unit 137
Sample Size 137
Sample Plan 137
Sampling Plan,Multi_Level,Continuous 138
Sampling Plan,Single 138
Sampling Plan,Double 138
Sampling Plan,Multiple 138
Sampling Plan,Single_Level,Continuous 138
Standard Sample 139
Sampling Plan,Sequential 139
Sampling,Biased 139
Specimen 139
Secondary Damage Mechanism 140
Specification Change Notice(SCN) 140
Survey,Product Oriented 140
Screening Inspection 140
Substitute Item 141
System 141
Subsystem 141
Subassembly 141
Support Equipment(SE) 142
System Segment 142
Service 142
Set 143
Selective Group Items 143
Special Group Items 143
Standard part 143
Support 144
Storage Life 144
Software Enhancement Proposal(SEP) 145
Software Support,Activity 145
Software Trouble Reports(STR) 145
Software Change Proposals(SCP) 145
Software Error 145
State-of-the-Ground Code 146
Survivability 146
Susceptibility 146
Single-Fail Operative 146
Shaker,Electromagnetic 147
Shaker,Electrodynamic 147
Shaker,Direct Drive 147
Shaker,Piezoelectric 147
System Design Review 148
Sensible Temperature 148
Shieded Enclosure 148
Shielding 148
System Engineering Process 148
Standard Part,Material or Process(PMP) 149
System Requirements Review 149
Star Fracture 150
Source Document 150
Stress Endurance Limit 150
Soak 150
Spalling 150
Storage Quality Control 151
Sag Forming 151
Strain Point 151
Solvent Cement 151
Sample Repersentative 151
Superseded Document 151
Testing 152
T 152
Test Provisions 152
Test Diserepancy 152
Test Facility 153
Test Specification 153
Threshold 153
Time,up 153
Technical Data 154
Technical Program Planning and Control 154
Tape Dump 155
Types of Load 155
Transportability Problem Item 155
Time,Mission 155
Time,Modification 156
Time,Alert 156
Time,Delay 156
Time,Checkout 156
Time,Not Operating 156
Time,Inactive 156
Time,Administrative 156
Time,Turn Around 157
Time,Active 157
Time,up(Uptim) 157
Time,Reaction 157
Test and Maintenance 157
Type Designation, 158
Trainer 158
Test,Endurance 158
Test,Environmental Simulation 158
Test Point 158
Thermal Tempering 159
Type 159
Test specimen 159
Test Language 159
Unification Meeting 160
Thermpplstic 160
Thermosetting 160
Thermopla stic 160
U 160
Unscheduled Maintenance 161
Universal Document Number 161
Useful Life 161
Unit of Produet 161
Uptime Ratio 161
Utilization Equipm ent 162
Unit Pack 162
Virtual Temperature 163
V 163
Verification 163
Validation 163
Vehicle Loading Configuration 164
Virtual Pressure 164
Visibility Chart 164
Vulnerability 164
Weapon System Software 165
W 165
Weapon System 166
Wearout 167
Work Area 167
Work Station 167
Working Environment 167
Waiver 168
Wearout Life 168
Working Group 168