1 General Provisions 1
2 Terms 2
3 Basic Requirements 4
4 Formwork Item Project 6
4.1 General Requirements 6
4.2 Formwork Installation 6
5 Reinforcement Item Project 10
5.1 General Requirements 10
5.2 Rebar 10
5.3 Rebar Fabrication 11
5.4 Rebar Connection 13
5.5 Rebar Installation 16
6 Prestressed Item Project 18
6.1 General Requirements 18
6.2 Materials 18
6.3 Fabrication and Installation 20
6.4 Tensioning and Detensioning 21
6.5 Grouting and Anchorage Sealing 23
7 Concrete Item Project 25
7.1 General Requirements 25
7.2 Raw Materials 26
7.3 Concrete Mixtures 27
7.4 Concrete Construction 28
8 Cast-in-situ Structure Item Project 30
8.1 General Requirements 30
8.2 Appearance Quality 31
8.3 Positional and Dimensional Deviation 31
9 Precast Structure Item Project 34
9.1 General Requirements 34
9.2 Precast Members 34
9.3 Installation and Connection 37
10 Concrete Structure Sub-part Project 39
10.1 Entitative Inspection of Structure 39
10.2 Acceptance of Concrete Structure Sub-part Project 39
Appendix A Records on Quality Acceptance 41
Appendix B Inspection on Structural Performance of Flexural Precast Members 44
B.1 Inspection Requirements 44
B.2 Inspection Method 47
Appendix C Strength Inspection of Specimen Cured at the Same Condition of Concrete Structure Entity 51
Appendix D Inspection on Concrete Strength of Structure Entity with Rebound-core Drilling Method 52
Appendix E Inspection on Rebar Cover Thickness of Structure Entity 54
Appendix F Inspection on Positional and Dimensional Deviation of Structure Entity 55
Explanation of Wording in This Code 56
List of Quoted Standards 57
- 《建筑施工企业统计》杨淑芝主编 2008
- 《市政工程基础》杨岚编著 2009
- 《工程静力学》王科盛主编 2019
- 《中央财政支持提升专业服务产业发展能力项目水利工程专业课程建设成果 设施农业工程技术》赵英编 2018
- 《化学反应工程》许志美主编 2019
- 《卓有成效的管理者 中英文双语版》(美)彼得·德鲁克许是祥译;那国毅审校 2019
- 《绿色过程工程与清洁生产技术 张懿院士论文集精选 上》《绿色过程工程与清洁生产技术》编写组编 2019
- 《软件工程》齐治昌,谭庆平,宁洪编著 2019
- 《化学工程与工艺专业实验指导》郭跃萍主编 2019
- 《AutoCAD 2018自学视频教程 标准版 中文版》CAD/CAM/CAE技术联盟 2019