当前位置:首页 > 语言文字
井巷设计与施工
井巷设计与施工

井巷设计与施工PDF电子书下载

语言文字

  • 电子书积分:16 积分如何计算积分?
  • 作 者:董方庭等主编
  • 出 版 社:徐州:中国矿业大学出版社
  • 出版年份:1991
  • ISBN:7810215523
  • 页数:518 页
图书介绍:
《井巷设计与施工》目录

PART Ⅰ DRIFT AND CHAMBER 3

Chapter 1 Rock Drift 3

1.1 Cross Section Design 3

1.2 Drilling and Blasting 21

1.3 Mucking 35

1.4 Supporting 52

1.5 Ventilation and Dust Suppression 74

1.6 Construction Methods for Tunnelling in Loose and Crushed Rocks 76

1.7 Tunnel Boring Machine 78

1.8 Tunnelling Methods & Organization and Management of Drift Crew 81

Chapter 2 Pit Bottom and Chamber 87

2.1 Structure and Type of Pit Bottom 87

2.2 Design of Major Chambers in Shaft Inset 92

2.3 Chamber Construction 108

2.4 Drift Crossing Design 123

2.5 Crossing Construction 131

Chapter 3 Drifts in Mining District 137

3.1 Method of Orientation for Development Drifting in Mining District 138

3.2 Coal Heading Construction 141

3.3 Alternate Heading Construction 152

3.4 Rise and Dip Construction 154

Chapter 4 Inclined Shaft 158

4.1 Structure of Inclined Shaft 158

4.2 Construction of Inclined Shaft 182

5.1 Introduction 201

Chapter 5 Vertical Shaft Design 201

PART Ⅱ VERTICAL SHAFT 201

5.2 Rigid Equipment of Shaft 204

5.3 Flexible Equipment of Shaft 213

5.4 Arrangement of Shaft Section 218

5.5 Design of Shaft Section 229

5.6 Shaft Collar and Shaft Sump 237

Chapter 6 Shaft Sinking 248

6.1 Sinking Through Surface Ground 248

6.2 Drilling and Blasting 263

6.3 Mucking 277

6.4 Shaft Lining 295

6.5 Control of Falling Water in Shaft 317

6.6 Other Auxiliary Works 332

6.7 Shaft Installation 338

6.8 Construction Scheme and Organization 345

6.9 Arrangement of Shaft Sinking Equipment 363

6.10 The Technical Development of Shaft Sinking Method 379

7.1 Sinking Headframe 388

Chapter 7 Shaft Sinking Structures 388

7.2 Working Platforms for shaft Sinking 410

7.3 Forms for Walling the Shaft 423

Chapter 8 Deepening of Vertical Shaft 432

8.1 Introduction 432

8.2 Protective Facilities for Shaft Deepening 435

8.3 Shaft Deepening by Using An Auxiliary Level 446

8.4 Shaft Deepening with A Deepening Compartment 453

8.5 Shaft Deepening by A Conventional Raise 456

8.6 Raise Driving with A Suspended Cage 461

8.7 Other Shaft Deepening Methods 467

8.8 Selection of Shaft Deepening Schemes 469

PART Ⅲ LABOR ORGANIZATION AND MANAGEMENT IN MINE CONSTRUCTION 477

Chapter 9 Preparations of Mine Construction 477

9.1 Contents of Preparation for Construction 478

9.2 General Working Plan of the Surface Shaft-site 481

9.3 Major Approaches for Shortening the Preparation Period 483

10.1 Mining Engineering Scheme and Sequence of Shaft Sinking 489

Chapter 10 Sequence of Shaft-sinking and Drifting 489

10.2 Modification Work in the Transitional Period fromShaft Sinking into Roadway Drifting 493

10.3 Sequence for Developing Shaft Station and Chambers 503

10.4 Arrangement of Roadway Drifting in Mining Sections 505

Chapter 11 Management of Mine Construction 506

11.1 Drawing up Design of Working Organization 506

11.2 Technical Management 510

11.3 Project Management 513

相关图书
作者其它书籍
返回顶部