图书介绍:DL/T 5409《核电厂工程勘测技术规程》分为4部分,本部分是根据《国家发展改革办公厅关于印发2005年行业标准项目计划的通知》的要求进行编制的。本部分规定了核电厂工程中勘测技术水文气象的基本技术要求和设计基准。本部分适用于核电厂工程中的勘测工程。

1 Scope 1

2 Normative References 2

3 Terms and Definitions 4

4 Basic Requirements 7

5 Hydrometeorological Survey 9

5.1 General Requirements 9

5.2 Survey on Storm Surge,Tsunami and Wave Occurring at Seashores and Tidal Estuaries 10

5.4 Low Water Survey 12

5.5 Water Resources Investigation 15

5.6 Investigations on the Stability of Sediment and Bank 18

5.7 Ice Regime Investigation 19

5.8 Extreme Weather Phenomenon Investigation 21

6 Design Basis Flood 23

6.1 General Requirements 23

6.2 High Astronomical Tides 23

6.3 Sea Level Anomaly 24

6.4 Storm Surge Set-up 25

6.5 Seiche Set-up 27

6.6 Tsunami or Lake Surge Set-up 28

6.7 Runoff Flood 29

6.8 Dam-break Flood 30

6.9 Effects of Waves 31

6.10 Floods Caused by Potential Natural Factors 33

6.11 Effects of Human Activities on Floods 34

6.12 Flood Caused by Small Watershed Rainstorm 34

6.13 Water Logging 36

6.14 Analysis on Combination of Flood Events 37

6.15 Flood Safety Analysis 39

7 Design Basis Low Water Level 41

7.1 General Requirements 41

7.2 Low Astronomical Tide Level 41

7.3 Storm Surge Set-down 42

7.4 Seiche Set-down 42

7.5 Tsunami or Lake Surge Set-down 42

7.6 Effects of Waves 43

7.7 Effects of River,Reservoir and Lake 43

7.8 Low Water Caused by Potential Natural Factors 44

7.9 Combination of Low Water Events 45

7.10 Analysis on Water Intake Safety for Nuclear Power Plants 46

8 Water Source 47

8.1 General Requirements 47

8.2 Natural Rivers 48

8.3 Reservoirs and Sluices 48

8.4 Downstream Rivers of Reservoirs and Sluices 51

8.5 Rivers in Channelized Areas 52

8.6 Lake 54

8.7 Sea 55

8.8 Salinity 55

8.9 Water Temperature 56

8.10 Effects of Human Activities on Water Sources 56

9 Stability of Sediment and Bank 59

9.1 General Requirements 59

9.2 Sediment Characteristics 60

9.3 Analysis,Calculation and Simulation of Flow and Sediment Movement 61

9.4 Evolution of Riverbed in the Design Bank Section 62

9.5 Evolution of Sea Bed in the Design Bank Section at Plant Site 65

9.6 Effects of Human Activities on Bank Stability 68

10 Design Basis Meteorological Parameters and Phenomena 70

10.1 General Requirements 70

10.2 Design Basis Wind 71

10.3 Design Basis Precipitation 72

10.4 Design Basis Snow Accumulation 73

10.5 Design Basis Temperature 74

10.6 Design Basis Meteorological Conditions of Final Heat Sinks and Related Systems 75

10.7 Design Basis Tornado 76

10.8 Design Basis Squall Line Wind 80

10.9 Design Basis Tropical Cyclone 80

10.10 Design Basis Extratropical Cyclone 82

10.11 Other Design Basis Meteorological Phenomena and Meteorological Parameters 83

11 Hydrometeorological Observation and Special Stations 85

11.1 General Requirements 85

11.2 Hydrometric Test 86

11.3 Marine Hydrometric Station 86

11.4 LandHydrometric Station 87

11.5 Meteorological Station 88

12 Work Contents and Depth during Each Stage of Hydrometeorological Survey for Nuclear Power Plants 89

12.1 General Requirements 89

12.2 Site Investigation and Survey Stage 89

12.3 Preliminary Feasibility Study Stage 93

12.4 Feasibility Study Stage 103

12.5 Preliminary Design Stage 120

12.6 Detailed Design and Construction Stage 132